Most of our customers open the online engine first: no installation, any browser, any device, with test history and performance review built in. But the NABCEP PV Installation Professional (PVIP) Board Certification package from TorrentExam also includes a printable PDF and a Windows desktop engine — all PVIP questions, every format.
NABCEP PVIP Exam Overview:
| Certification Vendor: | NABCEP |
|---|---|
| Exam Name: | NABCEP PV Installation Professional (PVIP) Board Certification Exam |
| Exam Number: | PVIP |
| Certificate Validity Period: | 3 years |
| Exam Format: | Live remote proctoring, Multiple-choice questions, Computer-based testing (CBT) |
| Passing Score: | 70 (scaled score 0–99) |
| Related Certifications: | PV Installation Specialist (PVIS) PV Associate PV System Inspector (PVSI) |
| Available Languages: | English |
| Exam Price: | $450 – $650 USD |
| Real Exam Qty: | 70 (60 scored, 10 unscored pilot) |
| Exam Duration: | 240 minutes |
| Recommended Training: | NABCEP Approved Training Providers |
| Exam Registration: | Meazure Learning Scheduling NABCEP Official Registration |
| Sample Questions: | ![]() |
| Exam Way: | Computer-based testing at authorized centers or live remote proctoring |
| Pre Condition: | Minimum 58 hours advanced PV training; OSHA 10-hour Construction Safety training; 6 project credits of installation experience; must be 18+ years old |
| Official Syllabus URL: | https://www.nabcep.org/certifications/pv-installation-professional-pvip/ |
NABCEP PVIP Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Operations & Maintenance | 13% | - Safety and maintenance documentation - Troubleshooting and fault diagnosis - System performance monitoring and reporting - Preventive maintenance procedures |
| Topic 2: Installation | 38% | - Electrical installation
|
| Topic 3: System Commissioning | 17% | - Pre-commissioning verification
- Functional testing
|
| Topic 4: System Design | 32% | - Site assessment and analysis
|
Asked and Answered: The PVIP Exam
The PVIP exam is NABCEP's official route to the PV Installation Professional (PVIP) Board Certification certification (Professional level). For IT professionals building a career, it signals verified skill — the kind of advantage that tips better opportunities your way. It also sits in a family of related credentials: PV System Inspector (PVSI), PV Installation Specialist (PVIS), PV Associate.
Delivery is instant — files unlock at payment and a copy lands in your email within a minute; our 24/7 online service team responds within 2 hours if anything goes missing, and there are no installation limits. On refunds, our guarantee is real but conditional: take the corresponding PVIP exam within 60 days of purchase, and if you fail, send a scanned enrollment slip plus the official Score Report PDF within 2 days of the exam — we process the full refund within 7 days. Exams taken within 3 days of purchase, name mismatches between candidate and payer, and free or expired products are excluded. Rather have a replacement? Exchange for two equal-value exam products free and keep your original updates.
Yes — the vendor points candidates to these courses:
Training teaches; practice reveals. Once a course ends, the PVIP practice questions from TorrentExam tell you how much of it will survive real exam conditions.
Minimum 58 hours advanced PV training; OSHA 10-hour Construction Safety training; 6 project credits of installation experience; must be 18+ years old Requirements like these do get updated, so confirm the details on the official exam page — official PVIP exam information — before you spend anything on registration.
Registration runs $450 – $650 USD, and the pass mark is 70 (scaled score 0–99). Paying by credit card is the standard route — safe and stable for both buyer and seller. And remember the fee is per attempt: a retake costs the same again, which is why candidates drill with the 162 practice questions from TorrentExam until their margin is comfortable.
The exam sets 70 (60 scored, 10 unscored pilot) questions against 240 minutes on the clock. That pairing punishes hesitation, so train it out: set a per-question budget, flag-and-return instead of freezing, and rehearse full timed sessions in the TorrentExam engine until pacing is automatic.
Yes — a free PDF demo lets you examine the question quality first. If you buy, 365 days of free updates are included, with new versions sent to you as they're released; an expired update period can be renewed later at 50% off.
Registration runs through the vendor's official channels:
The exam is available Computer-based testing at authorized centers or live remote proctoring — choose whatever fits your schedule and setup when you book.
Expect 4 domains in the NABCEP PV Installation Professional (PVIP) Board Certification blueprint, headlined by System Design (32%), Operations & Maintenance (13%), Installation (38%). Use the weights as your study budget — high-percentage domains earn the most points per hour. The complete outline above has the full breakdown.
NABCEP PV Installation Professional (PVIP) Board Certification Sample Questions:
A PV system is designed for a location with a peak sun hours (PSH) value of 4.5. The daily load is 18 kWh, and the system efficiency is 80%. What is the minimum array size required in kW?
- A. 7.5 kW
- B. 6.0 kW
- C. 4.0 kW
- D. 5.0 kW
Correct Answer: D 🗳️
A PV output circuit requires a disconnecting means per NEC 690.13. Where must it be located?
- A. Within sight of the inverter
- B. At the point of interconnection
- C. Within 10 feet of the array
- D. At the main service panel
Correct Answer: A 🗳️
A residential PV system uses two 120.240Vac utility-interactive inverters with a sealed lead-acid battery energy backup for protected loads. The MOST important protected load consideration when operating in the backup mode is that:
- A. The peak current from the sealed lead- acid batteries must not exceed peak demand currents.
- B. The stand-alone system configuration can adequately supply current to all protected load branch circuit.
- C. The protected loads must have automatic restart function.
- D. All protected loads are connected in multiwire branch circuits.
Correct Answer: D 🗳️
A grid-tied PV system uses a transformerless inverter with a maximum DC input of 1000V. The array consists of 20 modules, each with a Voc of 45V. What is the NEC 690.7 correction factor for a low temperature of -15° C if the temperature coefficient is -0.30%/°C?
- A. 1.18
- B. 1.21
- C. 1.12
- D. 1.15
Correct Answer: A 🗳️
According to the NEC, if the PV system disconnect and the building service disconnect are at different locations, there MUST be a/an:
- A. Interface that shuts down the PV system if the utility connection is lost.
- B. Means of locking out both disconnects when the PV system inverter is being serviced.
- C. Permanent plaque or directory that indicates the location of the PV utility connection.
- D. Permanent plaque or directory that indicates the locations of both disconnects.
Correct Answer: D 🗳️
Viewing page 1 out of 33 pages.
Viewing questions 1-5 out of 162 questions.