NEW QUESTION 19
Which is not the phase of corrective Maintenance
Please choose the correct answer.
Response:
- A. Control
- B. Notification
- C. Planning
- D. Base
Answer: D
NEW QUESTION 20
A customer has two production sites with one storage administrator at each site. The customer wants to replicate data between their SC9000 storage arrays. Each administrator uses a workstation with the Dell Storage Manager Client to manage their respective system. Now, the CEO wants data replicated between both sites.
What is the first step to configure replication between sites?
- A. Create a QoS node in Dell Storage Manager Client
- B. Configure an iSCSI network over WAN
- C. Initially sync data with USB hard drives
- D. Install Dell Storage Manager Data Collector
Answer: D
NEW QUESTION 21
What do you use to set up a refurbishment order for external refurbishment?
- A. An external operation that contains a control key for refurbishment.
- B. An order type for external refurbishment and a material item with item category External Refurbishment.
- C. An order type for external refurbishment and an assignment of a material with split valuation.
- D. An external operation that contains a subcontracting indicator and a material item with a material provision indicator activated.
Answer: D
NEW QUESTION 22
How many time-based cycles can you use in a multiple-counter maintenance plan?
- A. Two
- B. Zero
- C. Three
- D. One
Answer: D
NEW QUESTION 23
A customer wants to define an order type that includes a notification when the order is created.
Which Customizing step(s) must you perform?
- A. Set the indicator for notification data or order header and assign the notification type to the order type in Customizing.
- B. Assign the notification type to the order type in Customizing.
- C. Set the Notification indicator for the order type according to plant assignment in Customizing.
- D. Assign the notification type to the order type according to plant assignment in Customizing.
Answer: A
NEW QUESTION 24
A maintenance technician replaces a defective counter with a new counter.
Before the users can create a standard measuring document for the new counter, what step(s) must they perform?
- A. Create a new measuring point and change the measuring point from which the measurement reading was transferred.
- B. Create a new technical object to represent the new measuring point.
- C. Create a special measuring document and set the Counter Replacement indicator.
- D. Dismantle the old measuring point and create a new measuring point.
Answer: C
NEW QUESTION 25
Which of the following control characters is available in the edit mask of the structure indicator?
Please choose the correct answer.
Response:
- A. M (alphanumeric characters)
- B. D (numeric characters)
- C. A (alpha characters)
- D. Y (special characters)
Answer: C
NEW QUESTION 26
When you create a refurbishment order, which reference objects can you use? (Choose three)
- A. Functional location
- B. Material with serial number
- C. Material without serial number
- D. Equipment without serial number
- E. Equipment with serial number
Answer: B,C,E
NEW QUESTION 27
A user has planned an operation with labor costs and material costs; however, the material cost element is not assigned to a value category.
Where do the material costs appear in the value categories for the order?
- A. In a new, automatically created value category
- B. In the internal activity value category
- C. In the overhead value category
- D. In the unassigned value category
Answer: D
NEW QUESTION 28
Your customer wants to establish a maintenance work center with various activity types, each with a different fixed price. How do you accomplish this?
Please choose the correct answer.
Response:
- A. Create various maintenance activity types in each work center and assign a price.
- B. Define the activity types for each maintenance planning plant.
- C. Create various maintenance activity types with the fixed prices and assign them to the work
- D. Define the activity types in Controlling and assign them to the cost center of the work center.
Answer: D
NEW QUESTION 29
The view profile enables you to create a customized selection of tabs for use with technical objects.
Which Customizing step(s) must you perform to make a view profile available?
- A. Create the view profile for a particular screen group and then assign it to a functional location category or equipment category.
- B. Activate customized tabs for each equipment category or functional location category.
- C. Create the view profile and assign it to an object type.
- D. Create the view profile in the master record of either equipment or functional location.
Answer: A
NEW QUESTION 30
A maintenance work order has external processing. The planning plant and maintenance plant have different addresses. A purchase requisition is generated from a maintenance order.
With standard delivered SAP Customizing, which address is the default delivery address in the purchase requisition?
- A. Work center
- B. Maintenance plant
- C. Storage location
- D. Planning plant
Answer: D
NEW QUESTION 31
What does the maintenance plan category determine?
- A. The grouping of similar maintenance plans together for reporting
- B. How maintenance call objects are generated for a due maintenance call
- C. The type of technical object for the maintenance plan
- D. The type of maintenance call object the system generates for a due maintenance call
Answer: D
NEW QUESTION 32
What happens when you set the system status in a maintenance order to technically completed (TECO)?
(Choose two.)
- A. The system sets a deletion indicator for outstanding reservations.
- B. The system posts costs to the target account assignment.
- C. The system sets a deletion indicator for purchase orders assigned to the maintenance order.
- D. The system sets a deletion indicator for outstanding purchase requisitions.
Answer: A,D
NEW QUESTION 33
Which of the following control characters is available in the edit mask of the structure indicator?
- A. M (alphanumeric characters)
- B. D (numeric characters)
- C. A (alpha characters)
- D. Y (special characters)
Answer: C
NEW QUESTION 34
How does SAP make new functions of the SAP ERP application available to customers?
- A. Via Support Packages
- B. Via add-ons
- C. Via best practices
- D. Via enhancement packages
Answer: D
NEW QUESTION 35
Your customer wants to generate costing for internal activities.
For which of the following can you define various rates in Activity Type/Price Planning transaction?
There are 3 correct answers to this question.
Response:
- A. Plant
- B. Value category
- C. Cost center
- D. Plan/actual version
- E. Period
Answer: C,D,E
NEW QUESTION 36
Which of the following information can the shift report display? (Choose three)
- A. Planned and actual costs for shifts
- B. Measurement documents and goods movements
- C. Maintenance orders and notifications
- D. Digital signatures for approval of a shift report
- E. Maintenance plans and task lists
Answer: B,C,D
NEW QUESTION 37
How do you define operations for preventive maintenance tasks?
- A. By assigning the task list to the maintenance plan
- B. Directly in the maintenance item
- C. By assigning the task list to the maintenance item
- D. Directly in the maintenance plan
Answer: C
NEW QUESTION 38
You need to set up the iDRAC IP address on an SC Series controller with the following details:
* IP address 192.168.0.160
* subnet mask 255.255.255.0
* gateway 192.168.0.1
Which commands should be used to complete this task?
ifconfig inet set eth0 ip 192.168.0.160
- A. ifconfig inet set eth1 netmask 255.255.255.0
ifconfig inet set eth1 gateway 192.168.0.1
controller ipconfig set eth0 ip 192.168.0.160 - B. controller ipconfig set eth0 netmask 255.255.255.0
controller ipconfig set eth0 gateway 192.168.0.1
platform bmc set ip 192.168.0.160 - C. ifconfig inet set eth0 netmask 255.255.255.0
ifconfig inet set eth0 gateway 192.168.0.1
ifconfig inet set eth1 ip 192.168.0.160 - D. platform bmc set netmask 255.255.255.0
platform bmc set gateway 192.168.0.1
Answer: D
NEW QUESTION 39
Which of the following steps are required to create a measuring point for performance-based preventive maintenance?
There are 2 correct answers to this question.
Response:
- A. Activate the Measurement Reading Transfer indicator.
- B. Specify the annual estimated usage for the measuring point.
- C. Create the measuring point as a counter.
- D. Define a valuation code group.
Answer: B,C