[UPDATED 2026] CTS-I dumps Free Test Engine Verified By Certified Experts
Realistic CTS-I Accurate & Verified Answers As Experienced in the Actual Test!
NEW QUESTION # 38
Which of the following stage lighting instruments is used as a spotlight?
- A. Pan and tilt lighting
- B. ELS or Ellipsoidal Reflective Spotlight
- C. Parabolic Aluminized Reflector Light
- D. PAR64
Answer: B
NEW QUESTION # 39
What piece of test equipment is used to measure speaker resistance in a 70v distributed audio system?
- A. Impedance bridge/meter
- B. Ohm meter
- C. Pink noise generator
- D. Volt meter
Answer: A
NEW QUESTION # 40
In a rear projection system, light rays which reflect off the backside of the screen and strike the mirror more than once create _____.
- A. ghosting
- B. hum and buzz
- C. extra artifacts
- D. a secondary reflection
Answer: D
NEW QUESTION # 41
There is a conflict between the wall plate height specified in AV documents and the height the electrical contractor is saying must be used on site. Which of the following forms would be used by the integrator to seek clarification of the correct mounting height of wall plates?
- A. Change Order (CO)
- B. Construction Change Directive (CCD)
- C. Request for Change (RFC)
- D. Request for Information (RFI)
Answer: D
NEW QUESTION # 42
The number of times per second a display will draw the image sent to it is the ___.
Response:
- A. aspect ratio
- B. frame rate
- C. signal-to-noise ratio
- D. refresh rate
Answer: D
NEW QUESTION # 43
What are the benefits of using the ANSI/AVIXA 10:2013 Standard for Audiovisual Systems Performance Verification? (Choose all that apply.)
- A. Reducing project risk
- B. Creating reporting that completes the project documentation
- C. Providing a verifiable outcome
- D. Aligning outcome and performance expectations
Answer: A,B,C,D
NEW QUESTION # 44
After performing a Technical Site Survey, all information recorded should be relayed to:
Response:
- A. The Sales Person
- B. The Client
- C. The Building Engineer
- D. The AV Project Engineer
Answer: D
NEW QUESTION # 45
Which component would you use to distribute video from multiple sources to many displays or in different zones?
Response:
- A. Matrix switcher
- B. Distribution amplifier
- C. Scaler
- D. Scan converter
Answer: A
NEW QUESTION # 46
Which of the following are HDCP authentication steps? (Choose all that apply.)
- A. Locality check
- B. Audio and video sync check
- C. Session exchange
- D. Key exchange
Answer: A,C,D
NEW QUESTION # 47
What is the primary reason an AV installer should attend weekly construction meetings?
- A. Find out when the cafeteria is open
- B. Establish relationships with allied trade teams
- C. Learn about safety requirements
- D. Identify changes that will affect the AV installation
Answer: D
NEW QUESTION # 48
Which of the following can be used to automatically turn off unused microphones?
- A. filters
- B. Absorbers
- C. limiters
- D. gates
Answer: D
NEW QUESTION # 49
A customer has recently changed their phone system from a traditional POTS line to a VoIP-based switch. The new VoIP switch still dials out properly but no longer hangs up when the far end disconnects. What is the MOST likely problem?
Response:
- A. The on-hook voltage is correct and the hybrid is set to both "loop drop & call progress"
- B. The on-hook voltage is correct and the hybrid is set to "call progress"
- C. The on-hook voltage is too high and the hybrid is set to "loop drop"
- D. The phone line is now VOIP and cannot be used with an analog hybrid
Answer: C
NEW QUESTION # 50
Once an audio signal has left a microphone, what processor will it encounter first?
- A. The power amplifier
- B. Acoustic echo cancellation
- C. The preamplifier
- D. The audio mixer
Answer: C
NEW QUESTION # 51
When mounting a projector to the ceiling, one must identify the center point location of the mounting assembly, because:
- A. This is the projection throw distance calculation reference point.
- B. This is where the adjustable mount support structure must be centered.
- C. This is the center point of the projector's lens.
- D. This is the point where the projector's weight is evenly distributed over the entire mounting plate.
Answer: B
NEW QUESTION # 52
Why is color temperature awareness important in the AV industry?
- A. People expect exact "whiteness" when viewing a display.
- B. The AV industry strives to set the standard for "whiteness."
- C. AV equipment allows for adjusting the "whiteness" for optimal display.
- D. "Whiteness" is subjective with ever changing definitions.
Answer: C
NEW QUESTION # 53
Which diagram is used for positioning mounted equipment within a rack?
Response:
- A. A rack mounting diagram
- B. A rack building diagram
- C. A rack elevation diagram
- D. A rack system diagram
Answer: C
NEW QUESTION # 54
Which mounting hardware will provide the MOST support when mounting a camera bracket to sheetrock/plasterboard not located near a wall stud?
Response:
- A. Self tapping screws
- B. Plastic wall anchors / wall plugs
- C. Snap toggles / hollow wall anchors
- D. Masonry bolts
Answer: C
NEW QUESTION # 55
____ isolates and protects a signal from sources of electromagnetic and radio frequency interference.
- A. A transformer
- B. Coaxial Cabling
- C. Noise
- D. Shielding
Answer: D
NEW QUESTION # 56
A mirror mounting system must be ____.
- A. angled so that the mirror reflects the image into the screen twice
- B. electronically adjusted by the control system
- C. rigid once in place and adjustable during installation
- D. electrically connected to the technical ground
Answer: C
NEW QUESTION # 57
The connector pictured below is known as:
Response:
- A. Ancillary dimpled solder connection
- B. Insulation displacement
- C. Captive screw compression termination
- D. Direct connection termination
Answer: C
NEW QUESTION # 58
When plotting a cable route, where should you place the cable?
- A. Along complicated pathways
- B. Away from EMI sources
- C. Near motors or fans
- D. Close to fluorescent lighting
Answer: B
NEW QUESTION # 59
What does an elevation flag on a plan drawing indicate?
Response:
- A. Detailed view of the elevator or lift
- B. Related elevation drawings
- C. An interior view of a wall structure
- D. Loudspeaker mounting details
Answer: B
NEW QUESTION # 60
......
AVIXA CTS-I Exam Certification Details:
| Schedule Exam | Pearson VUE |
| Books / Training | Candidate Handbook |
| Sample Questions | AVIXA CTS-I Sample Questions |
| Duration | 150 mins |
| Number of Questions | 110 |
| Exam Name | AVIXA Certified Technology Specialist - Installation (CTS-I) |
AVIXA CTS-I - Installation Exam Syllabus Topics:
| Topic | Weight |
|---|---|
| Duty A: Conducting Pre-Installation Activities | 20% |
| Task 1: Review Audiovisual Project Documentation | 4% |
| Task 2: Conduct Technical Site Survey | 4% |
| Task 3: Prepare for Audiovisual Installation | 4% |
| Task 4: Evaluate Overall Facility Readiness | 4% |
| Task 5: Conduct On-Site Preparations for Installation | 4% |
| Duty B: Conducting Site Rough-In/First-Fix | 10% |
| Task 1: Deinstallation of Existing Equipment and cabling | 2% |
| Task 2: Mount Substructure | 4% |
| Task 3: Pull Cable | 4% |
| Duty C: Installing Audiovisual Systems | 38% |
| Task 1: Assemble AV Rack | 4% |
| Task 2: Wire the AV Equipment Rack | 5% |
| Task 3: Distribute AV Equipment | 4% |
| Task 4: Mount AV Equipment | 4% |
| Task 5: Terminate Cables | 5% |
| Task 6: Configure Network Properties of Equipment | 4% |
| Task 7: Load Configuration and Control Programs | 4% |
| Task 8: Test the AV System | 4% |
| Task 9: Calibrate the AV System | 4% |
| Duty D: Perform Systems Close Out | 11% |
| Task 1: Demonstrate to Client or Client's Representative that System Performs to Specifications | 4% |
| Task 2:Provide Training on System Operation | 4% |
| Task 3:Obtain Project Completion Sign Off from Client or Client's Representative | 3% |
| Duty E: Conducting Ongoing Project Responsibilities | 21% |
| Task 1: Complete Progress Reports | 3% |
Latest AVIXA CTS-I Practice Test Questions: https://www.torrentexam.com/CTS-I-exam-latest-torrent.html
Apr-2026 Pass AVIXA CTS-I Exam in First Attempt Easily: https://drive.google.com/open?id=1xgHZ5l-S3QfgSH2Svuc22CaHYxOYl5xP

