
Updated Apr 23, 2026 Verified Pass CTS-I Exam in First Attempt Guaranteed
Free CTS-I Sample Questions and 100% Cover Real Exam Questions (Updated 480 Questions)
AVIXA CTS-I - Installation Exam Syllabus Topics:
| Topic | Weight |
|---|---|
| Duty A: Conducting Pre-Installation Activities | 20% |
| Task 1: Review Audiovisual Project Documentation | 4% |
| Task 2: Conduct Technical Site Survey | 4% |
| Task 3: Prepare for Audiovisual Installation | 4% |
| Task 4: Evaluate Overall Facility Readiness | 4% |
| Task 5: Conduct On-Site Preparations for Installation | 4% |
| Duty B: Conducting Site Rough-In/First-Fix | 10% |
| Task 1: Deinstallation of Existing Equipment and cabling | 2% |
| Task 2: Mount Substructure | 4% |
| Task 3: Pull Cable | 4% |
| Duty C: Installing Audiovisual Systems | 38% |
| Task 1: Assemble AV Rack | 4% |
| Task 2: Wire the AV Equipment Rack | 5% |
| Task 3: Distribute AV Equipment | 4% |
| Task 4: Mount AV Equipment | 4% |
| Task 5: Terminate Cables | 5% |
| Task 6: Configure Network Properties of Equipment | 4% |
| Task 7: Load Configuration and Control Programs | 4% |
| Task 8: Test the AV System | 4% |
| Task 9: Calibrate the AV System | 4% |
| Duty D: Perform Systems Close Out | 11% |
| Task 1: Demonstrate to Client or Client's Representative that System Performs to Specifications | 4% |
| Task 2:Provide Training on System Operation | 4% |
| Task 3:Obtain Project Completion Sign Off from Client or Client's Representative | 3% |
| Duty E: Conducting Ongoing Project Responsibilities | 21% |
| Task 1: Complete Progress Reports | 3% |
| Task 2: Coordinate with Other Contractors | 4% |
| Task 3: Address Needed Field Modifications | 4% |
| Task 4: Repair AV Systems | 3% |
| Task 5: Maintain AV Systems | 3% |
AVIXA CTS-I Exam Certification Details:
| Number of Questions | 110 |
| Sample Questions | AVIXA CTS-I Sample Questions |
| MemberExam Price | $475(USD) |
| Duration | 150 mins |
| Books / Training | Candidate Handbook |
| Non-Member Exam Price | $575(USD) |
NEW QUESTION # 166
Which of the following is the AV team likely to perform during new construction?
Response:
- A. Run cables and install mounts
- B. Install the sprinkler system
- C. Mount the drop ceiling
- D. Build the firewall
Answer: A
NEW QUESTION # 167
__________ can transmit AV signals and other data up to a distance of 300 meters or more before signal quality is compromised.
Response:
- A. Shielded twisted-pair (STP) cabling
- B. Multimode fiber-optic cabling
- C. Coaxial cabling
- D. Unshielded twisted-pair (UTP) cabling
Answer: B
NEW QUESTION # 168
What are possible reasons for no picture on the screen?
Select all that apply.
Response:
- A. The hot plug pin is unable to detect a display device.
- B. A switcher is intercepting the hot plug detection.
- C. The source device is unable to read EDID data packets.
- D. The display device is not plugged in.
Answer: A,B,C,D
NEW QUESTION # 169
Which is the preferred method for the correction of keystone distortion?
- A. Digital
- B. Electronic
- C. Analog
- D. Optical
Answer: D
NEW QUESTION # 170
Which of the following are HDCP authentication steps? (Choose all that apply.)
- A. Session exchange
- B. Key exchange
- C. Audio and video sync check
- D. Locality check
Answer: A,B,D
NEW QUESTION # 171
The difference between the loudest and quietest levels of an audio signal is the ___.
Response:
- A. volume level
- B. frequency range
- C. dynamic range
- D. stereo level
Answer: C
NEW QUESTION # 172
When mounting a 75lb (34 kg) projector with a 15lb (7 kg) mount, the substructure should be able to support a minimum of:
- A. 180lbs (82 kg)
- B. 90lbs (41 kg)
- C. 450lbs (204 kg)
- D. 270lbs (122 kg)
Answer: C
NEW QUESTION # 173
What should you do with the case number or barcodes of unloaded equipment?
- A. Tear or scratch them out so no one can see them
- B. Nothing - there is no value in saving barcode numbers
- C. Peel them off the equipment so they can be reused on the next shipment
- D. Enter them into a logbook or inventory tracking system
Answer: D
NEW QUESTION # 174
Why do wall-mounted racks with swing-out glass doors require special attention during installation?
Select all that apply.
Response:
- A. The door gets in the way of mounting the equipment.
- B. The door could pinch the cables.
- C. The door may require installation before mounting the equipment.
- D. The swing-out door could jam in the carpet.
Answer: B,C
NEW QUESTION # 175
The second conductor of an unbalanced circuit _____.
- A. has the same impedance as the first signal conductor
- B. is an insulated wire which transports the signal
- C. is a shield around the wire used as the electrical circuit's return path
- D. carries an inverse image of the first signal conductor
Answer: C
NEW QUESTION # 176
What device is used to verify the signal integrity throughout a video system?
- A. Signal generator
- B. Oscilloscope
- C. Multimeter
- D. Spectrum analyzer
Answer: B
NEW QUESTION # 177
How would a commissioning technician establish substantial completion/practical completion?
- A. Complete a request for changes form, filing an RFQ
- B. Generate a list of all damaged equipment, setting up the DSP
- C. Complete all preliminary tests, confirm systems installation and readiness for final test
- D. Generate a punch or defects list, getting architects to sign off on repairs
Answer: C
NEW QUESTION # 178
Which of the following is a compiled program?
Response:
- A. Inventory of IP addresses
- B. DVD titles
- C. Raw code
- D. RAW codec
Answer: C
NEW QUESTION # 179
Which of the following factors is not related to the correct drilling of a pilot hole for mounting AV equipment?
Response:
- A. Ambient temperature
- B. Location of wires
- C. Length of screw
- D. Diameter of screw
Answer: A
NEW QUESTION # 180
Which of the following tasks would not be included in a preventive maintenance program?
(Choose all that apply.)
Response:
- A. Checking the batteries in uninterruptable power supply systems
- B. Checking the equalization and gain structure on the audio replay system
- C. Testing the failover systems for redundant spare equipment
- D. Changing the preset frequencies on the handheld radio system
Answer: D
NEW QUESTION # 181
What does an elevation flag on a plan drawing indicate?
- A. Loudspeaker mounting details
- B. Detailed view of the elevator or lift
- C. Related elevation drawings
- D. An interior view of a wall structure
Answer: C
NEW QUESTION # 182
An audio signal level that goes up to about 100V is _____ level.
- A. professional line
- B. mic
- C. loudspeaker
- D. consumer line
Answer: C
NEW QUESTION # 183
Perceived illumination decreases by _____ when the distance from a light source is doubled.
- A. 25%
- B. 95%
- C. 75%
- D. 50%
Answer: C
NEW QUESTION # 184
Audio Conferencing equipment makes use of acoustic_____ technology.
- A. reverberation
- B. echo-cancellation
- C. doppler
- D. phase shift
Answer: B
NEW QUESTION # 185
An architectural drawing was created using the U.S. customary scale of 1/8 inch = 1 foot. You measure a distance of 4.25 inches on the drawing. Which of the following is the actual distance in feet?
- A. 16ft
- B. 68ft
- C. 34ft
- D. 28ft
Answer: C
NEW QUESTION # 186
......
Download Real AVIXA CTS-I Exam Dumps Test Engine Exam Questions: https://www.torrentexam.com/CTS-I-exam-latest-torrent.html
Verified CTS-I Dumps Q&As - CTS-I Test Engine with Correct Answers: https://drive.google.com/open?id=1Wt2DCT-U_mlUy2u6fw7LVPIj_mwWlkSf

