Returned customers are the loudest testimony. Buyers come back to TorrentExam because we keep them informed of the latest SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing products — 89 practice questions for the C-TS422-2504 exam, updated free for 365 days.
SAP C-TS422-2504 Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing |
| Exam Number: | C-TS422-2504 |
| Exam Price: | USD 550 |
| Certificate Validity Period: | 2 years |
| Related Certifications: | SAP S/4HANA Cloud Private Edition Implementation Consultant - Production Planning and Manufacturing |
| Exam Format: | Multiple Select, Multiple Choice |
| Passing Score: | 58% |
| Exam Duration: | 180 minutes |
| Real Exam Qty: | 80 |
| Available Languages: | English |
| Sample Questions: | ![]() |
| Exam Way: | Online proctored exam or at SAP testing centers |
| Pre Condition: | SAP recommends having practical experience in Production Planning before attempting the exam. Familiarity with SAP S/4HANA is beneficial. |
| Official Syllabus URL: | https://learning.sap.com/certification/c_ts422_2504 |
SAP C-TS422-2504 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Material Management | 13% | - Procurement Types (Stock, Subcontracting, Pipeline) - Monitoring of Stock Requirements - Purchasing Information Records - Source Determination and List of Quota Arrangements - Release Procedure for Purchase Requisitions |
| Topic 2: Production Planning (PP) Processes | 20% | - Planning Run and MRP Evaluation - Demand Management and Sales Operations Planning - Rough-Cut Planning (RCCP) - Material Planning (MP) - Production Planning Detail (PPD) - Sales and Operations Planning (S&OP) |
| Topic 3: Plan Execution and Control | 16% | - Order Settlement and Variance Calculation - Capacity Planning and Leveling - Production Order Confirmation - Production Order Creation and Management - Order Release and Printing - Material Staging and Component Allocation |
| Topic 4: SAP S/4HANA Cloud Private Edition Overview | 12% | - Reporting and Analytics in Production - Deployment Options and System Landscape - Cloud Private Edition Architecture - Business Role: Production Supervisor - Business Role: Manufacturing Specialist |
| Topic 5: Integration Topics | 12% | - Integration with Finance (FI/CO) - Integration with Materials Management (MM) - Integration with Plant Maintenance (PM) - Integration with Quality Management (QM) - Integration with Production Engineering (PE) |
| Topic 6: Production Planning Master Data | 11% | - Long-term Planning Data - Bill of Materials (BOM) - Work Centers and Work Center Hierarchies - Routings and Production Versions - Material BOM vs. Equipment BOM |
| Topic 7: Planning Concepts | 16% | - Planning Strategy (Make-to-Stock, Make-to-Order) - MRP Live and Live Cache - Material Requirements Planning (MRP) Principles - Planning Time Fence and Planning Horizon - Planning Parameters and MRP Groups |
SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing Exam FAQ — Smart Answers
The SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing is SAP's certification exam for SAP Certified Associate, at the Associate level. It validates skills employers hire for, which is why it can affect your career and future. Related credentials include SAP S/4HANA Cloud Private Edition Implementation Consultant - Production Planning and Manufacturing.
Files arrive by automatic email within a minute of payment — unlimited installations, and 24/7 customer assisting for any login or downloading issues if nothing shows up within 2 hours. If you fail the corresponding C-TS422-2504 exam within 60 days of purchase, you have options: a full refund (send a scanned enrollment slip plus the official Score Report PDF within 2 days of the exam; processed within 7 days), waiting for the next updated version free, or changing to two other equal-value dumps free. Excluded: exams within 3 days of purchase, candidate names that don't match the payer, and free or expired products.
SAP recommends having practical experience in Production Planning before attempting the exam. Familiarity with SAP S/4HANA is beneficial. Vendors revise eligibility rules from time to time, so verify the current requirements on the official page (official C-TS422-2504 exam page) before booking.
The SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing blueprint covers 7 domains — including Production Planning Master Data (11%), SAP S/4HANA Cloud Private Edition Overview (12%), Integration Topics (12%). The weightings tell you where to spend your hours; the complete outline above lists every subtopic.
USD 550 per attempt, 58% to pass. A retake bills the full fee again, so prepare smartly: work through the 89 practice questions for the C-TS422-2504 exam at TorrentExam before you book.
180 minutes for 80 questions. Efficient preparation includes pacing: rehearse timed sets until the clock feels manageable, not menacing.
Yes — download the free SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing demo and judge the quality before paying. Purchases include 365 days of free updates, with each latest version emailed to you immediately; renew afterward at 50% off.
SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing Sample Questions:
You use planning strategy Finite Scheduling with Reverse want to allow scheduling in the past. How can you parameterize this in the strategy profile?
- A. Specify a negative opening period.
- B. Specify a negative planning horizon.
- C. Specify a negative offset time.
- D. Specify a negative PP/DS horizon.
Correct Answer: C 🗳️
What information do you have to maintain to define the relationship between supply source dem source in the Kanban process? Note: There are 2 correct answers to this question.
- A. Production supply area
- B. Work Center
- C. Routing
- D. Replenishment strategy
Correct Answer: A,D 🗳️
What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation? Note: There are 2 correct answers to this question.
- A. Changes are automatically implemented in the complete collective order.
- B. Scheduling of an operation takes place as close as possible to the desired date.
- C. Sequencing on multiactivity resources is automatically updated.
- D. Neighboring operations can be moved in both directions in order to create a slot.
Correct Answer: A,B 🗳️
Advanced Planning uses data from SAP S/4HANA Cloud Private Edition. In which master data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.
- A. Material
- B. Production version
- C. Plant
- D. Work center
Correct Answer: A,D 🗳️
What are the advantages of collective orders? Note: There are 2 correct answers to this question.
- A. To perform availability checks across the entire collective order
- B. To coordinate orders in the planning board for a collective order
- C. To show the flow of batches across the entire collective order
- D. To post confirmations for the entire collective order
Correct Answer: A,D 🗳️








